Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.
1
/
의
6
Creative+Safety+Supply
Project Planning Dry-Erase Whiteboard 48" x 36"
Project Planning Dry-Erase Whiteboard 48" x 36"
정가
$680.55 USD
정가
$680.55 USD
할인가
단가
/
단위
배송료는 결제 시 계산됩니다.
픽업 사용 가능 여부를 로드할 수 없습니다.
Overview
- Color : White
- Size : 48" x 36"
- Material : Aluminum, Metal, Vinyl
- Brand : Creative Safety Supply
- Finish Type : Vinyl decal
About this item
- Magnetic Dry-Erase Surface – Vinyl-printed surface resists stains and ghosting for long-term visibility and smooth writing performance
- Easy Installation – Includes mounting brackets and hardware for secure and hassle-free wall mounting
- Durable Aluminum Frame – 1" aluminum border paired with a 2.5" deep aluminum tray for convenient accessory storage
- Usable Writing Surface – Writing area measures 2" less than the board's total dimensions
Share
